The building is a production entity, in which Yazaki Bulgaria Ltd. carries out the assembly of automobile cable installations.

 

The newly built factory is located between Dimitrovgrad and Haskovo, in the Golаta chuka area near the village of Krepost. The production entity is located on a plot of 64.5 square meters and its total area is over 33 thousand square meters. The total investment for land, construction and technological equipment amounts to 50 million euro. The project was implemented in accordance with the “Tailor-made” model from the construction-investment company Horizont-Ivanov EOOD, the subsidiary Horizont Rent EOOD, as well as Yazaki Bulgaria EOOD. The building, along with parking, green areas and technical infrastructure have been completed in only one construction stage for a period of 12 months.


This is the third plant of the Japanese company in Bulgaria, after those in Sliven and Yambol, which works together with the automotive manufacturers Renault, Daimler and Ford.

The building includes the necessary production and storage areas, premises for building and technical maintenance as well as the built and functioning supporting facilities.

It is free standing and consists of two main parts: production and storage unit and administrative and communal unit. The production and storage unit is on one floor and includes several main zones - production, raw materials warehouse, finished goods warehouse, laboratories, technical and complementary premises. The administrative and communal unit is a two-storey building and includes an administrative area, staffrooms, canteen, and a kitchen unit. 

The total built-up area for production activity, warehouses, servicing and technical premises is 24 840 sq.m. The total built-up area of the administrative part is 5 586 sq.m.

 

The production process covers activities from the design through to full completion in ready electrical installations.

 

The buildings are 100% air-conditioned.

The construction itself and the input of heating, air conditioning, ventilation and lighting equipment lead to extremely low energy costs.

  

Approximately 180 parking spaces for cars and 50 parking spaces for buses are provided to the factory.

 

About 3 500 people are expected to work in the new entity.